Send SMS
Call us
Contact us
Skip to content Skip to footer

FLOOR DEMOLITION

Project:Full Tear-Out & Subfloor RestorationShare

This demolition project required meticulous removal of old tile flooring found throughout the kitchen and dining areas. Our team used professional dust-control equipment to minimize airborne particles and maintain cleanliness during the process.

The first step was carefully breaking and lifting every tile without damaging the underlying subfloor. Once all old material was removed, we transported the debris offsite for proper disposal. After clearing the area, we performed a detailed inspection to determine the subfloor’s condition.

We found several uneven sections and minor cracks, which we repaired using specialized leveling compounds and reinforcement materials. This restoration step is essential for ensuring the longevity of any future flooring installation.

After preparing the entire surface, we cleaned the subfloor thoroughly and verified its readiness for new material. This level of preparation guarantees a smoother installation process and helps prevent future issues such as squeaking or shifting.

The completed demolition and restoration gave the homeowner a clean, safe, and perfectly level surface ready for the installation of new flooring—ensuring the next steps in the renovation would be smooth and efficient.